Concept illustration
We design voice alarm around building zones, acoustics and evacuation scenarios. Message priorities, fire-alarm interfaces and staff controls are defined together.
Deliver messages to the required parts of the building.
Select loudspeakers and positions for the acoustic environment.
Line supervision, backup power and interface testing.
Equipment is selected for the task, site conditions and component compatibility. The final specification and availability are confirmed when preparing the proposal.
Architecture, amplifiers and loudspeakers are matched to zones and acoustic requirements.
Official product information ↗We assess the solution alongside the fire system and verify project suitability and documentation.
Official product information ↗Objectives, drawings and existing equipment.
Architecture, specification and agreed workflows.
Installation, configuration and operational checks.
Documentation, training and maintenance arrangements.
Share the facility type, objectives and existing systems so we can prepare a relevant proposal and define the next step.