Data centres

Concept images, not photographs of completed projects.

See the conditions. Control the access.

Data centres need controlled boundaries, visible building conditions and documented infrastructure. Physical security and facilities operations are aligned with the site’s availability requirements.

Different zones. Different priorities.

Systems and brands to consider

These are selection options, not a single ready-made package. Models, protocols, licences, availability and compatibility are checked during design.

Role at the facility

Perimeter, entrances, corridors and rack aisles, with coverage of the agreed control points.

Brand options
Hanwha VisionAxisBoschAvigilon
Role at the facility

Milestone provides central video, recording and operator permissions; Eluviant adds controlled-area events and video search.

Brand options
MilestoneEluviant
Role at the facility

Successive access boundaries, temporary contractor permissions, logs and review of door events.

Brand options
AritechSuprema
Role at the facility

Detection considers airflow and technical-room conditions; the fire design determines the architecture.

Brand options
RUBEZHBolidBoschKidde
Role at the facility

Voice messages and alarm zones for staff, coordinated with the layout and site procedures.

Brand options
BoschEdwards
Role at the facility

Cooling, environmental readings and building alarms. ALC WebCTRL can support supervision and agreed DCIM/EPMS interfaces.

Brand options
SAUTERCarrierALC / Automated LogicBosch
Role at the facility

Security and building-system networks, segmentation and resilience; production IT networks have separately defined requirements.

Brand options
FortinetHPECiscoHuaweiH3C
Role at the facility

Fibre and copper links, racks and patching, cable organisation, testing and as-built documentation.

Brand options
LegrandCommScopeINFRALANECOLANSHIP

Fire control and voice alarm follow the agreed design; VMS and BMS do not replace dedicated life-safety systems.

How the systems work together

A change in data-hall conditions

Illustration of a VMS operator workstation with a CCTV monitoring video wall
  1. Measure

    A controller receives the reading from the specified sensor.

  2. Compare

    The BMS displays the deviation, trend and related equipment states.

  3. Respond

    The duty engineer checks the cause and follows the defined procedure.

  4. Confirm

    Reading history helps confirm a return to normal operating conditions.

An example to agree during design. System interfaces and staff procedures are configured and tested for the specific facility.

Where the project starts

We review priorities and existing systems, then define the solution scope and implementation stages.

  • Zoning and IT/facilities responsibility boundaries.
  • Resilience requirements and building-signal inventory.
  • Existing BMS, DCIM, access, network and cabling systems.
Discuss your solution
Manufacturer resources

Industry examples and platform capabilities; Secuart selects the solution for your facility.

Let’s discuss your facility
Tell us about the facility, its scale and existing systems. We will clarify the requirements and next step.
8 778 358 23 04
info@secuart.kz
Astana, 4 Zhenis Avenue

Working Hours:
Mon–Sat: 09:00 AM – 06:00 PM
Sun: Closed
Made on
Tilda