
Approaches & spectator areas
Entrances, concourses, seating areas and parking. Coverage and analytics are selected for actual crowd routes.
Concept images, not photographs of completed projects.
An arena changes operating mode with its schedule of games and concerts. Coverage, access, announcements and building settings follow spectator flows and event-team operations.

Entrances, concourses, seating areas and parking. Coverage and analytics are selected for actual crowd routes.

Separate permissions for staff, organisers and contractors. Ticketing interfaces are assessed against the ticket platform’s capabilities.

Zoned voice announcements, fire signals and building modes for preparation, the event and closing.
These are selection options, not a single ready-made package. Models, protocols, licences, availability and compatibility are checked during design.
Entrances, concourses, seating, staff routes and parking: fixed, PTZ and multi-sensor cameras selected for the task.
Milestone provides operator views and recording; Eluviant adds agreed-area analytics and post-event search.
Staff routes, changing rooms, technical areas and temporary team permissions; ticketing integration is assessed separately.
Detection zones and event indication across spectator, staff and technical spaces.
Bosch and Edwards are considered for voice alarm; priorities, zones and acoustic design follow the project requirements.
HVAC schedules and building-system status for preparation, event and idle modes.
PoE, control-room connectivity and separation of security, staff and guest Wi-Fi networks.
Backbones between arena zones, camera and workstation links, cabinets and capacity for temporary infrastructure.
Fire control and voice alarm follow the agreed design; VMS and BMS do not replace dedicated life-safety systems.

Temporary rights are assigned to work crews and contractors.
Cameras, announcement paths and equipment states are checked.
Operators use agreed video layouts and communication procedures.
Temporary rights are removed and event records and building modes are reviewed.
An example to agree during design. System interfaces and staff procedures are configured and tested for the specific facility.
We review priorities and existing systems, then define the solution scope and implementation stages.
Industry examples and platform capabilities; Secuart selects the solution for your facility.